29
Aug
Membership

New Members: energyRe Giga-Projects USA, LLC; and Janus Power LLC.
Termination: Windham Energy Center LLC.
Name Changes: Research Power Corporation; and Icetec Energy Services, LLC.

28
Aug
Order 2023 Further Compliance Changes

FERC accepts Further Order 2023 Compliance Changes (revisions to Section I.2.2, Schedules 11, 22, 23, and 25 of Section II, and Section III.13 of the Tariff), without change or condition, eff. Aug 12, 2024

27
Aug
ISO-NE FERC Form 3-Q

ISO-NE submits its 2025 Q2 FERC Form 3Q

27
Aug
D&E Agreement: NSTAR / BXP

NSTAR files D&E Agreement pursuant to which it will assess and be reimbursed for its work to assess the feasibility and cost to underground two 115 kV transmission lines located in Waltham, Massachusetts

27
Aug
NERC Reliability Standards Definition Changes

NERC files for approval proposed changes to the definitions of Generator Owner and Generator Operator (to include owners and operators of non-Bulk Electric System
Inverter-Based Resources (IBR) that individually or collectively have an aggregate nameplate capacity of greater than or equal to 20 MVA, connected through a system  designed primarily for delivering such capacity to a common point of connection at a voltage greater than or equal to 60 kV

26
Aug
MEPCO Attachment H Updates

MEPCO answers Emera’s request for relief in this proceeding, asserting that the request is procedurally improper and any relief sought by Emera related to past service
over MEPCO or any associated charges should be pursued in a separate proceeding.

26
Aug
FAP Changes to LC Issuer Eligibility, and Forms of LC, Security and BlackRock Control Agreements

FERC accepts changes to the FAP (eff. Sep 1, 2025), that: (i) adds two new circumstances under which ISO-NE may draw upon a Market Participant’s letter of credit (“LC”) (“Risk  Mitigation Draws”); (ii) modifies the eligibility criteria for banks that issue LCs to ISO-NE; and (iii) conforms several other provisions regarding the forms of acceptable financial assurance.  

26
Aug
Sched. 21-VTransco: Section 10 - Real Power Losses Clarifications

FERC accepts revisions to Schedule 21-VTransco that clarify the Section 10 provisions regarding the calculation of real power losses, eff. Sep 1, 2025

22
Aug
2026 NERC/NPCC Budget Filing

NERC submits proposed 2026 Business Plan and Budget for itself and its Regional Entities, including NPCC

21
Aug
NEPGA Balancing Ratio and Stop Loss Allocation Methodology Complaint
EL25-106
20
Aug
Waiver Request: Capacity Performance Payment Calculation and Use of Late Payment Account (ISO-NE)

ISO-NE requests limited waivers of Market Rule 1 section 13.7.2.6 (Calculation of Capacity Performance Payments) and section 3.3(e) (Late Payment Account) of the Billing Policy so that Brookfield White Pine Hydro’s Harris Hydro Unit 2 is reimbursed/made whole for an approximately $68,000 Performance Payment Charge related to the June 24, 2025 Capacity Scarcity Condition (CSC) for which ISO-NE has determined Harris 2 should not have been charged.  As explained in the Waiver Request, ISO-NE manually prevented Harris 2 from running at its EcoMax during the CSC because a non-commercial resource, that was not conducting an otherwise permitted commissioning activity, was incorrectly permitted to run.  To rectify the financial consequences of the situation described, ISO-NE proposes the limited waivers so that the June 24  Performance Payment Charge is not reflected as part of Harris 2’s final invoice for that Operating Day and the amount to be returned to Harris 2 off-set by a withdrawal from the Late Payment Account.  

20
Aug
Wholesale Distribution Tariff - Versant

Versant responds to Aug 8 Deficiency Letter

19
Aug
CIP-IROL (Schedule 17) Section 205 Cost Recovery - Bucksport

Bucksport requests recovery of $292,870 in CIP-IROL Costs incurred between Apr 1, 2023 and Mar 31, 2025

18
Aug
Capital Projects Report - 2025 Q2

NEPOOL submits comments supporting ISO-NE’s 2025 Q2 Capital Projects Report 

15
Aug
NEPGA Balancing Ratio and Stop Loss Allocation Methodology Complaint

MMWEC submits comments supporting Complaint

15
Aug
Membership Suspension Notices
not docketed

ISO-NE submits notice of suspensions from the ISO-NE Markets of: AllChoice Energy, Berlin Station, and Hudson Energy Services

15
Aug
Amended LGIAs

ISO-NE and CMP file amendments to LGIAs with CPV Saddleback Ridge Wind and CPV Canton Mountain Wind to reflect changes to the ownership, Interconnection Customer names and certain details in the Appendices of the LGIAs

13
Aug
NSTAR (MMWEC)-HQ US Use Rights Transfer Agreement

NSTAR files for acceptance an Agreement with HQUS for the Transfer of MMWEC’s Use Rights on the Phase I/II HVDC Transmission Facilities

13
Aug
203 Application: Burgess BioPower / White Mountain Power

FERC authorizes White Mountain Power (an affiliate of, among others, Bridgewater Power and David Energy Supply) acquisition of all of the indirect ownership interests of Berlin Station in connection with a plan of reorganization under Chapter 11 of the US Bankruptcy Code

11
Aug
MEPCO Attachment H Updates

Noting that currently effective Attachment H appears to state that 2 Grandfathered TSAs (GTSAs) that it holds were renewed only through July 31, 2014 and July 31, 2013 respectively, Emera requested that the FERC either (i) approve the request to revise Attachment H to the extent that the request confirms that the Emera GTSAs are valid and in full force and effect, or (ii) direct MEPCO to provide refunds to Emera for any period in which Emera paid MEPCO for transmission service that was not available to Emera under the MGTSAs because Attachment H and/or the OASIS was not updated in a timely manner.

08
Aug
Capital Projects Report - 2025 Q2

ISO-NE files 2025 Q2 Report

08
Aug
NECEC Tariff Conforming Changes

ISO-NE and NEPOOL file Conforming Tariff Changes to support implementation of the NECEC Transmission Line as an “Other Transmission Facility” and to support the operation of, and transmission service over, the NECEC Transmission Line

08
Aug
Wholesale Distribution Tariff - Versant

FERC issues deficiency letter; response due on or before Sep 8, 2025