Oct 31, 2025 – GMP Schedule 21-GMP Revisions
Date:
Oct 31, 2025
Proceeding Type:
Sched. 21-GMP: BTM Gen & SSCDC Cost Revisions
Docket:
ER26-386
Brief Description:

Green Mountain Power filed revisions to Schedule 21-GMP (i) to clarify how behind the meter generation (BTM) is treated for purposes of calculating Local Network Load and (ii) to its billing methodology for Scheduling, System Control and Dispatch Costs (SSCDC). 

Close