Jun 15, 2023 – Schedule 21-VP Changes
Date:
Jun 15, 2023
Proceeding Type:
Schedule 21-VP Real Power Loss Factor Change
Docket:
ER23-2142
Brief Description:

Versant files a revised Schedule 21-VP to reflect a change in the Real Power Loss factor for Local Point-To-Point Service from 1.99% to 1.764%.

Close