July 26, 2023 – Correction to Transmittal Letter Transmission Rate
Date:
Jul 26, 2023
Proceeding Type:
Schedule 21-VP: Versant/Black Bear LSAs
Docket:
ER23-2035
Brief Description:

ISO-NE and Versant Power submit correction to transmittal letter, clarifying that discounted transmission rate for the 7 LSAs will be as provided in those LSAs – 1151.67/MW-month

Close