Feb 17, 2022
Date:
Feb 17, 2022
Proceeding Type:
Sched. 23: NSTAR/Berkshire Wind/ISO-NE SGIA
Docket:
ER22-720
Brief Description:

FERC accepts a non-conforming SGIA between NSTAR and Berkshire Wind to cover the continued interconnection of Berkshire Wind’s 19.6 MW Brodie Mountain facility in Lanesborough and Hancock, MA.  The SGIA, which replaces a 2014 SGIA, reflects an increase in Capacity Network Resource Interconnection Service,  as well as other updates. 

Close