Aug 27, 2025 — NERC Revised Def of GO and GOP
Date:
Aug 27, 2025
Proceeding Type:
NERC Reliability Standards Definition Changes
Docket:
RD25-10
Brief Description:

NERC files for approval proposed changes to the definitions of Generator Owner and Generator Operator (to include owners and operators of non-Bulk Electric System
Inverter-Based Resources (IBR) that individually or collectively have an aggregate nameplate capacity of greater than or equal to 20 MVA, connected through a system  designed primarily for delivering such capacity to a common point of connection at a voltage greater than or equal to 60 kV