Date:
May 09, 2024Proceeding Type:
Extended-term/Longer-term Transmission Planning Phase 2 Tariff Revisions Docket:
ER24-1978Brief Description:
ISO-NE, NEPOOL and the PTO AC jointly submit Tariff revisions to establish, as part of the optional, longer-term transmission planning process, the mechanisms that enable the New England states to develop policy-based transmission facilities in connection with Longer-Term Transmission Studies, and the associated cost allocation methods for these upgrades.