Date:
Feb 20, 2025Proceeding Type:
Revised Reliability Standard: TPL-008-1Docket:
RD25-4Brief Description:
FERC approves a proposed new Reliability Standard TPL-008-1 (Transmission System Planning Performance Requirements for Extreme Temperature Events) and a proposed definition of “Extreme Temperature Assessment” for inclusion in the Glossary of Terms.