Dec 20, Order granting UI Rate incentives ER24-167
Date:
Dec 10, 2024
Proceeding Type:
UI Rate Incentives for Fairfield to Congress 115kV Railroad Project
Docket:
ER25-167
Brief Description:

FERC approves a Construction Work in Progress (“CWIP”) Incentive and an Abandoned Plant Incentive (together, the “Incentives”) in connection with UI’s Fairfield to Congress 115kV Railroad Project (the “Project”). The Project is a transmission line rebuild project in Fairfield, CT and Bridgeport, CT that includes the relocation of transmission lines from 7.3 miles of the existing CT Department of Transportation’s Metro-North Railroad corridor and a rebuild of a 115-kV transmission line along 0.23 miles of existing UI right-of-way to allow interconnection of the rebuilt facilities with UI’s existing Ash Creek, Resco, Pequonnock, and Congress Street substations.  The Incentives were approved eff. Dec 21, 2024, as requested. 