Date:
Aug 28, 2023Proceeding Type:
CSC CIP-IROL (Schedule 17) Section 205 Cost Recovery FilingDocket:
ER23-1826-001Brief Description:
FERC accepts revised CSC rate schedule that allows for recovery of $723,601 in CIP-IROL Costs incurred between Jun 1, 2021 and Dec 31, 2022.