Jul 5, 2023 – Order accepting LGIA (RILFG)
Date:
Jul 05, 2023
Proceeding Type:
LGIA - RIE / ISO-NE / Rhode Island LFG Genco
Docket:
ER23-1741
Brief Description:

Second Revised LGIA that governs the interconnection of Rhode Island LFG Genco, LLC’s 38 MW facility located in Johnston, RI.

Close