Date:
Jul 13, 2022Proceeding Type:
CIP IROL (Schedule 17) Cost Recovery Schedule Filing: GenConn MiddletownDocket:
ER22-2367Brief Description:
GenConn Energy requests FERC acceptance of a proposed rate schedule to allow GenConn Middletown to begin the recovery period for certain CIP-IROL Costs under Schedule 17 of the ISO-NE Tariff