Date:
Oct 14, 2025Proceeding Type:
CIP-IROL (Schedule 17) Cost Recovery Schedule Filing: Kleen EnergyDocket:
ER26-132Brief Description:
Kleen Energy requests FERC acceptance of a proposed rate schedule to allow Kleen Energy to begin the recovery period for certain Interconnection Reliability Operating Limits Critical Infrastructure Protection costs (“CIP-IROL Costs”) under Schedule 17 of the ISO-NE Tariff. Kleen Energy stated that the rate schedule will provide interested parties notice of Kleen Energy’s intent to recover CIP-IROL Costs for its facility designated as an IROL-Critical Facility, and an order accepting the rate schedule will provide an effective date after which associated costs incurred can be recovered following completion of the process contemplated by Schedule 17 and a subsequent Section 205 filing identifying the specific costs to be recovered.